Construction Cost: Phase III: $830.000 (without lab relocation)
Date Complete: 2002
Key Personnel: Julie Wellner, Margaret Smith
|
Wellner Architects, Inc. provided complete architectural services and extensive coordination with structural, mechanical and electrical engineers for this project that provided animal pharmaceutical manufacturing space for a product transferred from another plant. The 3,050 square foot facility was to be located in an existing 12,000 square foot single‑story building within a light industrial office park. Coordination with the construction of a manufacturing cell already under construction in the same building was required, as was relocation of a product‑testing lab. Modifications to the existing structure were required to provide a two‑story space necessary for the manufacturing process. Mechanical requirements included a dedicated air‑handling unit and dust collection systems to be located adjacent to the building and zoning required the equipment to be extensively screened to comply with zoning requirements. Project spaces included locker and break facilities, mixing, manufacturing, cutting and coatin