Solid Dosage Process Train

Construction Cost:    $22,000,000 (including equipment)

Date Complete:        2001

Key Personnel:         Julie Wellner


.

Wellner Architects was hired by this local pharmaceutical company to design this manufacturing process train for solid dosage products, which includes hazardous B compounds. The train is a total of 20,000 square feet on three levels and includes dispensing, granulating, drying, blending, capsule filling, and tablet pressing. All product and material are fully contained so the operators do not require special protective equipment other than standard clean room dress.

Print Friendly Version